  • 352 reservoir from CCF roof
  • 351 failed extruded seam weld
  • 350 failed extrusion weld
  • 349 failed extruded weld
  • 346 completely full 3of3
  • 345 completely full 2of3
  • 344 completely full 1of3
  • 343 completely full
  • 342 reservoir from CCF roof
  • 341 Reservoir from CCF roof
  • 340 Reservoir from CCF roof
  • 338 reservoir filling
  • 337 reservoir 5 percent full
  • 335 cover complete, filling
  • 334 reservoir filling
  • 331 cover complete, looking up
  • 326 floating cover sand tubes and floats
  • 325 floating cover nearly complete
  • 324 floating cover nearly complete
  • 323 floating cover nearly complete
  • 322 floating cover nearly complete
  • 319 extra anchors installed on parapet wall
  • 318 hatch door
  • 317 installing hatch in base
  • 315 cover mostly done, installing hatch in bottom,
  • 314 cover in place with walkway on SW corner
  • 313 drilling for missing or damaged anchor bolts
  • 312 installing air vents
  • 311 batten bar on top of parapet wall with fold ov
  • 310 floating cover with floats and sand tubes in p
  • 309 cover in place, over inlet
  • 308 floats and sand tube installation
  • 307 CIM1000 mastic along stairs
  • 306 cover in place
  • 305 CIM1000 mastic at base of stairs
  • 304 CIM1000 mastic on concrete at stairs
  • 303 cover installation
  • 299 inlet cage reinstalled
  • 298 reinstallation of inlet cage
  • 297 reinstallation of inlet cage
  • 292 cover installation
  • 291 batten bar seal along stairs
  • 290 batten bar seal looking down at stair top
  • 289 batten bar seal looking down at stairs
  • 288 air lance testing liner along parapet wall pan
  • 280 installation of cover
  • 276 Air lance testing seams on liner
  • 275 Air lance testing seams on liner
  • 272 liner in place
  • 271 filling old 12in drain with concrete
  • 271 batten bar sealing around inlet assembly
  • 265 liner installed
  • 264 installing liner around inlet assembly
  • 262 liner 50 percent installed
  • 261 field weld parapet panel to floor panel (showi
  • 260 field weld parapet panel to floor panel
  • 259 welding parapet wall panel to floor panel (nor
  • 256 field seam weld before extruded weld on top
  • 255 field heat weld of liner
  • 254 liner installation
  • 251 anchoring of panel along top
  • 250 North panel of liner installed
  • 249 installation of liner on north panel
  • 248 installation of liner, chaffing strip on top
  • 246 heat welding geotextile seam
  • 245 geotextile on North panel
  • 243 first section of geotextile in N panel
  • 231 finished reservoir surface facing south
  • 230 parapet wall repair NE corner
  • 229 finished parapet wall repair
  • 228 crack in parapet wall repair
  • 227 reservoir with concrete added in bottom
  • 226 parapet wall repair
  • 225 parapet wall repair
  • 221 parapet wall repair prep