Parish Creek Fish Barrier Replacement

Project Overview

Project goals include the following:

  • Replace the existing fish barrier culvert the crosses W Belfair Highway at Parish Creek with a 2-lane bridge. The existing 48-inch culvert is classified as a complete fish passage barrier by the Washington Department of Fish and Wildlife (WDFW).  The bridge and reconstructed stream reach will provide for passage of native fish including coho and steelhead.
  • Mitigate recurrent flooding at the crossing location by removing the flow constriction caused by the existing culvert. 

Project Status 

The project has received a final design and construction grant from the federal PROTECT program administered by the Washington Department of Transportation (WSDOT). Final design will be completed by late 2026.  Public meetings are not currently planned. Bidding is planned for spring 2027 and construction is planned for summer 2027.  

Funding

Preliminary design was funded by the stormwater utility fund. PROTECT grant funding has been obtained for final design and construction. ($567k stormwater utility fund, $2,266k PROTECT Grant) 

Schedule

  • Grant application submitted – February 2024
  • Grant funding awarded – June 2024
  • Final Design consultant selected – December 2024
  • Final Design completed – December 2026 
  • Bid advertisement for construction – February 2027
  • Construction initiated – June 2027
  • Construction complete – November 2027

Contact Us

David Dinkuhn, PE
Project Manager, City of Bremerton Engineering Division
Ph: 360-473-5331
Email

Sign up to receive news and alerts from the City of Bremerton.

Parish Creek
Graphic 1. Project Location Map

Parish Creek
Graphic 2. Existing Culvert Outfall (48” CMP)

Parish Creek
Graphic 3. Fishway Downstream of Outfall