Project Overview
The original Well 9 was drilled in 1977 but was shut down in 2010 due to issues drawing water from it. The City still maintains water rights to this location and will be drilling a new well next to the existing well to provide additional sources for the City’s water system. The wells in this area supply much of the water to East Bremerton.
Project Location
Funding
This project is funded in the 2022 Water Budget.
Schedule
Bidding: September 2022
Construction: October 2022 – December 2022
Contact
Bill Davis, P.E.
Project Manager
Ph: 360-473-2312
Email
Michele Filley, P.E.
Project Engineer
Ph: 360-473-2349
Email