Sheridan Road Sewer Replacement

Project Overview

The Work includes removal and replacement of approximately 140 feet of existing 8-inch concrete sewer pipeline on Sheridan Road installed in 1964 with new PVC sewer pipe. The existing sewer pipeline is failing in some sections and beyond its useful life and is not a candidate for repair using trenchless technology. This project will increase the longevity of the collection system and reduce the entrance of grit and groundwater into the system. A portion of the westbound lane will be resurfaced with new asphalt.  

Project Status (July 2025) 

Project was awarded to Flowline LLP. A Pre-Construction Conference was held July 23rd. The contractor is expected to mobilize in early August 2025.

Project Location

Sheridan Road Sewer Replacement

Funding

Contract Amount: $156,252.47

Schedule

Begin construction in August 2025. Anticipated completion in August or September 2025.

Contact Us

Denton Lynch; EIT
Project Manager, City of Bremerton Engineering Division
Ph: 360-473-2350
Email