Accessible Parking Installation

Project Description

From March through April 2019, a survey was conducted to determine the City of Bremerton’s compliance with Public Right of Way Accessibility Guideline 2011, PROWAG, with respect to marked and/or metered on-street parking. Based on the findings of the survey, a new on-street parking layout was developed. Public Works and Utility Staff collaborated on a work plan to implement the new on-street parking layout which will be completed entirely by city crews. Work on the project began in December 2019.

Project Status

City crews have now completed the majority of work which did not require physical alterations of the existing roadway improvements and sidewalks. The blocks with completed improvements include:  

4 - #191516172224272839
40414243444546474849
5051535556575859  


The remaining improvements require removal of existing sidewalks, curb and gutter to construct ADA ramps, place and install sign bases, and other work.  This work is anticipated to be completed by Fall of 2024.

Accessible Parking Installation

Contact Us

  1. ADA Coordinator 

    Gunnar Fridriksson, P.L.S., P.E.
    345 6th Street, Suite 100
    Bremerton, WA 98337
    Email

    Ph: 360-473-5758
    Fx: 360-473-5398